Identifying the Most Important Rework Factors in Building Projects and Providing a Solution to Reduce Their Effects
By: Taghizadeh, Katayoon.
Contributor(s): Noorzai, Esmatullah.
Publisher: USA Springer 2021Edition: Vol, 102(4), December.Description: 1027-1043p.Subject(s): Civil EngineeringOnline resources: Click here In: Journal of the institution of engineers (India): Series ASummary: Rework in construction is inevitable. It has a direct impact on the cost and the time of the project. Therefore, finding the factors that lead to rework can help control the extra cost and time as well as preventing from design problems among architects, construction engineers, contractors and users. In this study, twenty factors that lead to rework have been extracted from previous research. After examining the output data from factor analysis, the factors affecting rework have been divided into four variable groups: Project management, Education, Changes and Interaction with the environment (Immersion). Lack of understanding of the project model by the designer, contractor and user is one of the direct consequences of “Changes,” “Education” and Interaction with the environment that affect rework. A virtual environment, using virtual reality, has been proposed on a one-to-one scale where the users can be immersed in the environment; this virtual model helps better understand the project at the design stage.Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Articles Abstract Database | School of Engineering & Technology (PG) Archieval Section | Not for loan | 2021-2022524 |
Rework in construction is inevitable. It has a direct impact on the cost and the time of the project. Therefore, finding the factors that lead to rework can help control the extra cost and time as well as preventing from design problems among architects, construction engineers, contractors and users. In this study, twenty factors that lead to rework have been extracted from previous research. After examining the output data from factor analysis, the factors affecting rework have been divided into four variable groups: Project management, Education, Changes and Interaction with the environment (Immersion). Lack of understanding of the project model by the designer, contractor and user is one of the direct consequences of “Changes,” “Education” and Interaction with the environment that affect rework. A virtual environment, using virtual reality, has been proposed on a one-to-one scale where the users can be immersed in the environment; this virtual model helps better understand the project at the design stage.
There are no comments for this item.